---
title: "Northrop Grumman orders sixth Falcon 9 launch for Cygnus as Antares 330 remains delayed"
description: "Northrop Grumman has ordered a sixth Falcon 9 launch for Cygnus, prolonging its reliance on SpaceX. The NG-25 mission launches on November 29, while the in-house Antares 330 remains unready."
date: 2026-11-24T20:42:36.571Z
lang: en
url: https://xab.info/en/posts/northrop-grumman-orders-sixth-falcon-9-launch
tags: [northrop-grumman, spacex, falcon-9, cygnus, iss, antares-330]
author: "Roman V."
publisher: "XAB.info"
---

# Northrop Grumman orders sixth Falcon 9 launch for Cygnus as Antares 330 remains delayed

![Falcon 9 rocket launch and Cygnus cargo spacecraft in Earth orbit](https://xab.info/media/2026/11/24/northrop-grumman-shestoi-zapusk-falcon-9-dlya-cygnus/northrop-grumman-shestoi-zapusk-falcon-9-dlya-cygnus-1.webp)

## Key Points

- Northrop Grumman has placed a sixth order for a Falcon 9 launch to carry a Cygnus freighter.
- The NG-25 mission, featuring the Cygnus XL ship named after James Lovell, launches November 29 from Cape Canaveral; docking is set for December 1.
- The in-house Antares 330 rocket is not ready: the company claims "significant progress" but provides no dates.
- The NG-22 mission remains off-schedule indefinitely following cargo module damage in March 2025.

Northrop Grumman has placed a sixth order for a SpaceX Falcon 9 rocket launch to deliver its Cygnus cargo spacecraft to the International Space Station. Dave Schaller, the company’s vice president of civil space programs and science, announced this at a press conference held ahead of the NG-25 mission. The NG-25 launch is scheduled for November 29 from Cape Canaveral. This move confirms the company's continued reliance on SpaceX infrastructure while development of its own Antares 330 carrier remains unfinished.

### Dependency on SpaceX: Cygnus's fifth flight on Falcon 9

The NG-25 mission will be the fifth Cygnus spacecraft to head to the ISS on a Falcon 9 following the retirement of the previous Antares 230+ launcher. Missions NG-20, NG-21, NG-23, and NG-24 previously launched on this vehicle. This sixth ordered launch effectively extends Northrop Grumman’s reliance on SpaceX: until its own carrier is ready, the company is forced to continue booking third-party launch windows, creating a long-term logistical and financial link to a competitor's infrastructure.

### James Lovell spacecraft and December 1 docking

The upcoming NG-25 mission will carry the Cygnus XL spacecraft, named after astronaut James Lovell. It will deliver approximately five tons of cargo, including ISS equipment, scientific experiments, and other supplies. Docking is planned for December 1: the station’s crew will capture the spacecraft with the Canadarm2 robotic arm and berth it to the Unity module. This is a standard procedure for Cygnus that does not require manual docking by the crew.

### Antares 330: "Significant progress" but no firm dates

Dave Schaller offered only vague generalities regarding the timeline for the new Antares 330 carrier. According to him, the company has made "significant progress in development," but the schedule remains subject to change as testing and further work on the rocket continue. The Northrop Grumman representative did not disclose specific dates for the first launch, the readiness of individual components, or plans for test flights. This leaves an uncertainty gap regarding when the company will regain its independence in cargo delivery.

### The shadow of NG-22: damaged ship with no clear recovery timeline

The NG-22 mission remains a separate issue for the program. In March 2025, the container holding the spacecraft’s pressurized cargo module was damaged during transport, and a subsequent inspection revealed damage to the module itself. The flight, originally scheduled for June 2025, was canceled. Northrop Grumman still plans to send NG-22 to the ISS after repairs but has not provided a timeline for the mission's return to the manifest. The company does not rule out further use of other carriers, stating it continues to coordinate the Cygnus flight schedule with NASA and launch providers, asserting it does not expect interruptions in launch availability for its cargo missions.

## Fact-Check & Sources

- [Northrop Grumman заказала шестой запуск Falcon 9 для Cygnus: собственная ракета Antares 330 всё ещё не готова](https://www.ixbt.com/news/2026/11/24/northrop-grumman-zakazala-sestoi-zapusk-falcon-9-dlia-cygnus-sobstvennaia-raketa-antares-330-vse-eshhe-ne-gotova.html) - Original source, text matches the basis: sixth Falcon 9 order, NG-25 launch November 29, Lovell-named ship ~5t, docking December 1, Antares 330 status, and March 2025 NG-22 incident.

## FAQ

### How many Falcon 9 launches has Northrop Grumman ordered for Cygnus?

Six. This was announced by VP Dave Schaller at the pre-mission press conference.

### When and where does the NG-25 mission launch?

Launch is scheduled for November 29 from Cape Canaveral, with docking at the ISS on December 1.

### What is the cargo capacity of the NG-25 Cygnus ship?

The Cygnus XL ship, named after James Lovell, will deliver approximately five tons of cargo, including station equipment and scientific experiments.

### Is the Antares 330 rocket ready?

No. The company reports "significant progress" but refuses to disclose first launch dates or component status.

### What happened to the NG-22 mission?

A cargo module container was damaged in March 2025, followed by identified damage to the module itself. The flight was canceled, and no return date has been set.