On the night of November 20, 2026, Russia launched one of the most massive missile and drone attacks on Ukrainian territory, using ballistic and cruise missiles. As a result of the strike, railway infrastructure in several sections of the network was damaged. According to Ukrzaliznytsia, a number of trains are delayed, and on certain routes, traffic has been temporarily suspended due to damage inflicted on infrastructure facilities. Railway workers have already begun repair work on the damaged sections, striving to restore the network to working order as quickly as possible.
Ukrzaliznytsia: Continuing Operations While Maintaining Safety Measures
Ukrzaliznytsia's press service stated that despite one of the most massive missile and drone attacks, the company continues train operations. "At the same time, we strictly observe all safety measures and, in the event of a threat to our passengers and employees, carry out evacuations," the company emphasized. Ukrzaliznytsia noted that the past night was extremely difficult for monitoring groups and all railway workers on duty. Constant threats from the enemy force the company to make prompt decisions on delaying or rerouting trains, which affects the schedule.
Restoration of Traffic in Kyiv and Kyiv Region
The Kyiv City Express is already restoring traffic. This route is key for passenger movement between the left and right banks of the capital, making its resumption critical for urban mobility. Suburban trains in Kyiv and the Kyiv region are also continuing operations with enhanced safety measures. Meanwhile, due to constant threats, a number of trains are delayed. Up-to-date information on delays and schedule changes is published on the official Ukrzaliznytsia website.
Casualties and Destruction in Kyiv and Lviv
In Kyiv, three people were killed as a result of the shelling. According to preliminary information, the victims are employees of Kyivvodokanal. The number of wounded is about 15 people. In Lviv, destruction was also recorded as a result of the massive attack. Full data on the extent of damage in both cities is still being clarified.
Work of Monitoring Groups and Infrastructure Restoration
Ukrzaliznytsia teams are already working on the damaged sections of the railway infrastructure, tasked with restoring the network's throughput capacity as quickly as possible. Monitoring groups on duty during the night of the attack continue to monitor the situation and coordinate restoration efforts. The company emphasizes that the safety of passengers and staff remains the priority, so traffic may be restricted on sections where the threat persists until the consequences of the strike are fully eliminated.