On the night of November 19, 2026, the Crimean Bridge, connecting Krasnodar Krai with occupied Crimea, suffered its third strike in a week. This is reported by RBC-Ukraine, citing Russian sources, including the Meduza media outlet. The Russian Ministry of Transport confirmed the attack and announced the suspension of train traffic across the crossing; the agency specifies that there are no casualties and specialists are assessing the damage.

Target of the Strike and Condition of the Railway Section

According to preliminary data, the target of the night strike was the railway section of the bridge. Information previously surfaced online about at least two hits on this part of the crossing. Meanwhile, the Crimean Wind Telegram channel, citing eyewitnesses, writes that the arch of the railway section of the bridge is not visible at the site of the damage, meaning it remained in place. The extent of the destruction as of the morning of November 19 has not been officially disclosed.

Chronology of This Week's Strikes

The first strike against the bridge this week occurred on November 16. At that time, the occupation administration blocked automobile traffic, and multi-kilometer traffic jams formed on the approaches to the crossing. Kremlin spokesman Dmitry Peskov claimed the damage was insignificant, but photographs published later captured damage to the roadbed and the deformation of one of the arches. On the night of November 17, the bridge was attacked again: a series of explosions thundered in the area of the Kerch Strait crossing, transport traffic was stopped, and it later became known about partial destruction — an arch and a road span fell into the water.

Sides' Reactions and Operation Preparation

The Russian-appointed head of Crimea, Sergey Aksyonov, reported that Russian specialists are assessing the damage. According to Volodymyr Zelenskyy, Ukraine prepared the operation for several weeks. Russian Deputy Prime Minister Marat Khusnullin reported to Vladimir Putin on repair preparations; the timeline for restoring the automobile part of the bridge has not been named at the time of publication. On the morning of November 19, the General Staff of the Armed Forces of Ukraine in its channel "congratulated" Lisbon's Vasco da Gama Bridge on holding the title of the longest in Europe — an indirect hint at the night attack, since this title previously belonged to the Crimean Bridge.

Significance of the Crossing

The Crimean Bridge remains a key transport artery linking the peninsula with the mainland. Repeated strikes in a short period and the stoppage of railway traffic indicate that the crossing continues to be a priority target, and its restoration, according to available data, is not yet complete.