On the evening of November 16, 2026, the city of Dnipro was left completely without electricity following Russian strikes on the energy infrastructure of the Dnipropetrovsk region. The DTEK press service reported this, emphasizing that in the wake of the energy strikes, the most difficult situation was in Dnipro. "After the attack on the region's energy facilities, Dnipro is completely blacked out. Electricity is also unavailable to residents of the Dnipro, Samara, and Kamianske districts," the company stated.

Scale of outages and consequences

According to Ukrenergo, large-scale power supply interruptions were recorded not only in Dnipro but also in several other cities in eastern Ukraine, including Kharkiv, Poltava, and Zaporizhzhia. The cause was damage to energy infrastructure resulting from the Russian strikes. Ukrenergo noted that Russia has been systematically attacking Ukrainian energy infrastructure for over a month, attempting to leave entire cities and regions without power.

In addition to the blackout, other consequences of the attacks were recorded in Dnipro. According to Mayor Borys Filatov, two people were killed, and ten apartment buildings, civilian vehicles, as well as a locomotive, a railway tank car, agricultural machinery, and industrial facilities were damaged.

Reaction of authorities and energy workers

Dnipro Mayor Borys Filatov reported that due to the Russian strikes, "almost half the city" was left without power. "In fact, this is the sixth blackout in the last two weeks," he stated. Energy workers have already begun restoring power supply: priority is being given to water and heat supply systems, as well as social facilities and critical infrastructure, including hospitals.

Risks of repeat strikes

DTEK warned that further strikes by the Russian invaders could hinder the power restoration process. All responsible services are coordinating their efforts to stabilize the situation and gradually return electricity to residential and industrial consumers. As of the evening of November 16, according to DTEK, the city remained completely blacked out, and repair work on the energy grid was ongoing.