Element Holding has suspended the implementation of a project to establish power electronics production based on gallium nitride (GaN). According to CNews, the decision to freeze the FAB GaN factory was made following an audit by Sberbank. Initially, the project, valued at 4.56 billion rubles, was scheduled to be launched in 2028; however, its implementation has now been put on hold due to funding issues. The freezing of one of the holding's key areas has become a prominent signal of a strategic review in domestic power electronics.
What the Enterprise Was Supposed to Produce
The enterprise, named FAB GaN, was slated to produce 5,500 silicon wafers with a diameter of 200 mm annually. These substrates were intended for the production of power GaN transistors with operating voltages from 100 to 650 V—a component in high demand across power electronics, telecommunications, and the energy sector. Element anticipated that the new production would cover 40–50% of the Russian market's demand for such components. The project was set to involve Connector-Optics, NIIET, and Assembly Systems, indicating an intention to build a vertically integrated chain from substrate to finished product.
Reasons for the Freeze: Audit and Financing
The key reason for halting the project was an audit by Sberbank, after which funding was revised. Funding issues prevented further progress toward the 2028 launch, and the holding's management decided to pause the initiative. This is not the bank's first intervention in Element's projects; previously, a similar procedure affected another major power electronics division of the holding.
Impact on the 'Kubik' Project
Problems also affected another flagship project of the holding—'Kubik', which provides for the production of components based on silicon and silicon carbide. Its implementation timeline was previously postponed to 2029 following a Sberbank audit that required a complete overhaul of the project. At the same time, in May 2026, Element still purchased foreign equipment worth 5.6 billion rubles for 'Kubik', indicating a partial continuation of activity in this area. According to industry media estimates, Russian production of power diodes and transistors based on Micron remains a project under review.
Strategic Context: UMC and Shareholders
Element Holding is set to become the foundation of the newly formed United Microelectronics Company (UMC), whose development until 2030 involves investments totaling 1.1 trillion rubles. Since 2026, Sberbank has become the holding's largest shareholder with a 49.8% stake, while Rostec owns another 41.66%. The freezing of FAB GaN and the postponement of the 'Kubik' timeline are occurring against the backdrop of a significant increase in the bank's equity stake, which strengthens the influence of financial discipline and auditing procedures on the pace of semiconductor program implementation.