On the temporarily occupied territory of the Luhansk region, preparations for the autumn-winter period are progressing with a significant lag behind the planned pace. As of the end of August 2026, less than two months remain before the start of the heating season, yet a substantial portion of the work is still unfinished. This was reported by the head of the Luhansk Regional Military Administration, Oleksandr Kharchenko, whose words are cited by RBC-Ukraine.

Heat Mains Halfway There, Gas and Electrical Networks — Only a Third

According to Kharchenko, the preparation of heat mains is more than half complete — that is, slightly over 50% of the work has been done. At the same time, the situation with gas and electrical network facilities looks considerably worse: over the four months of preparation, work on these networks has been completed by only about 30%. Thus, by the time stable cold weather sets in, a significant part of the region's energy infrastructure may remain unprotected, posing a direct threat to residents of the occupied territories.

The "Third Stage": From Promises of Restoration to the Disappearance of What Survived

Kharchenko also recalled the earlier statements by the Russian side on restoring the destroyed cities of the Luhansk region. Four years ago, he said, the Russian authorities promised to quickly rebuild the destroyed settlements of the region. Subsequently, as the official noted, the occupation administration moved on to the demonstrative restoration of social facilities and houses that had not been destroyed in the fighting. Now, according to Kharchenko, the situation has reached the point where even the elements of public infrastructure that survived the fighting are beginning to disappear. As an example, he cited one of the streets of Severodonetsk, where the sidewalk paving laid before 2022 has vanished. According to the official, it remained intact during the assaults, but now the pedestrian part of the street is covered with sand. Kharchenko called this the "third stage" after the promises of restoration and the showpiece renewal.

Winter Promises to Be No Easier: Strikes on Civilian Infrastructure Are Intensifying

According to forecasts voiced by Ukrainian authorities, the coming winter will not be easier than the one that just passed. The Head of the Cabinet of Ministers of Ukraine, Kostiantyn Hrytsiuk, notes that Russia has intensified strikes on civilian infrastructure, which further complicates the task of preparing energy systems for the heating season. Under such conditions, even those regions that formally complete their preparations must be ready for the most difficult scenario of events.

Kyiv Prepares Personnel Decisions for Lagging Regions

Against the backdrop of systemic problems with winter preparations, Ukrainian President Volodymyr Zelenskyy recently announced "personnel decisions" for those oblasts that are lagging in preparatory work on implementing resilience plans. This statement resonates with the situation in occupied Luhansk, where, in essence, the issue is not local lag but the systemic absence of a functional management structure capable of providing basic utility services. RBC-Ukraine also notes that the Chernihiv region, for its part, is preparing for the upcoming heating season, and its residents need to be ready for the most difficult development of events.