Schemes Instead of Concrete: How 2.7 Million Was Stolen for a Command Post in Zhytomyr Region
The SBU detained a female engineer in the Zhytomyr region for stealing 2.7 million UAH from the construction of a command post. Instead of a fortress, the military received an unfinished structure made of low-quality materials. 🔨💸
Read more →